Wrapped pilings on a new boat lift
We wrapped these pilings for a fender system built for a boat lift in New Smyrna Beach
Our kayak served as a work barge while wrapping 400+ pilings at the Smyrna Yacht Club
Phillip underwater welding in Morgan City, LA
Getting ready to clean and inspect piling wrap in Edgewater
Phillip getting ready to dive in Louisiana
Cleaning pilings before inspecting and wrapping them
The final results of a full cleaning and inspection. Pilings are wrapped, then inspected annually.
Stacy nailing the bottom of the piling wrap
We wrapped the pilings on this new dock in New Smyrna Beach
Another piling wrap job in NSB
Annual inspection and cleaning of piling wrap in Edgewater
Wrapped piles on a new dock in NSB
Stacy getting ready to go to dive in Louisiana
One reason to have a bottom survey/debris removal: old fishing tackle wrapped on pilings.
Wrapped pilings should be inspected after major storms. Debris can gouge and tear the wrap making it ineffective
Stacy wrapping pilings for a new boat lift
Stacy wrapping pilings at a dock in Edgewater
Wrapping new pilings in NSB
The beginnings of marine borer damage found during a dock inspection
Critical damage to a piling from marine borers. This hole was completely covered by oyster growth, hiding the damage.
Delignification causes wood to appear "fuzzy" and significantly impacts the integrity of a piling
Growth on pilings can hide the damage being done by marine borers. Even wrapped pilings should be cleaned and inspected annually.
Advanced damage from ship worms and isopods
Unwrapped pilings can be damaged by delignification and from marine borers
We inspected two mooring systems in New Smyrna. Moorings should be inspected and cleaned at a minimum of every 3 years.
Inspection on 4 year old wrapped pilings. Piling wrap should be cleaned annually to keep barnacles from growing in the seam, making the wrap less effective.
AFTER picture of 90' of seawall that we cleaned
Floating dock BEFORE cleaning
Section of 90' seawall before we cleaned it.
Floating dock AFTER cleaning
We cleaned and inspected over 500' of PVC on the floating dock at the NSB City Marina.
Pholad borings on a cross brace.
Completed piling wrap job in Edgewater
Completed piling wrap job in Edgewater
Completed piling wrap job in Edgewater
Even Keel Divers helped Dockside Specialties assemble the floating docks for the Freedom Boat Club in New Smyrna Beach
Even Keel Divers helped Dockside Specialties assemble the floating docks for the Freedom Boat Club in New Smyrna Beach
Even Keel Divers helped Dockside Specialties assemble the floating docks for the Freedom Boat Club in New Smyrna Beach
Even Keel Divers helped Dockside Specialties assemble the floating docks for the Freedom Boat Club in New Smyrna Beach
A shipworm infested piling. This damage was covered by oyster clusters.
A shipworm infested piling. This damage was covered by oyster clusters.
Piling wrap should be cleaned regularly. Barnacles and oysters can grow in the wrap seam, making the wrap ineffective.
A recent dock inspection revealed that the pilings were not wrapped all the way to bottom, leaving the pilings exposed to marine borers.
Ship worm infestation on a piling that was only partially wrapped. This damage could have been prevented if the contractor had fully wrapped the pilings.
Ship worm infestation on a piling that was only partially wrapped. This damage could have been prevented if the contractor had fully wrapped the pilings.
Pilings wrapped before they were driven. The bottom wraps are damaged and there is a gap of exposed piling.
Pilings wrapped before they were driven. The bottom wraps are damaged and there is a gap of exposed piling.
Pilings wrapped before they were driven. The bottom wraps are damaged and there is a gap of exposed piling.
Pilings wrapped before they were driven. The bottom wraps are damaged and there is a gap of exposed piling. The top wrap was only nailed in half way.
We wrapped these newly driven pilings in Venezia.
Isopod damage in a piling in New Smyrna.
Another wrap job completed in Edgewater
Another wrap job completed in Edgewater
A 26 foot Snap Jacket installed in Ponce Inlet
Piling wrap job completed in Edgewater
Bottom survey for a new dock in New Smyrna Beach
New piling wrap in Edgewater
New piling wrap in New Smyrna
New piling wrap in New Smyrna