Stacy Stepanovich Stacy Stepanovich

Did you get what you paid for?

A recent dock inspection revealed that the pilings were only wrapped on top, where it could be seen. Here’s how to make sure you got what you paid for.

Read More
Marine Borers Stacy Stepanovich Marine Borers Stacy Stepanovich

Isopods are Everywhere

Even docks built with treated lumber are vulnerable to attack from marine wood borers. One species of isopod is tolerant of all treated lumber, even creosote. Sphaeroma Terebans closely resembles its terrestrial counterpart, the “roly poly” and even rolls into a ball when removed from its burrow.

Read More
Stacy Stepanovich Stacy Stepanovich

Ormond Beach Dock Inspection

We conducted another Level I dock inspection yesterday in Ormond. The inspection was to determine if the existing dock was viable enough for a boat lift.

Read More
Stacy Stepanovich Stacy Stepanovich

When to Wrap Pilings

When pilings are wrapped prior to being driven, the wrap can be damaged. On bottom the wrap can be torn or ballooned out, making the wrap ineffective.

Read More

Contact us.

evenkeeldiving@gmail.com
(386)-516-DIVE (3483)